Showing posts with label Redesigning The 1956 Triumph. Show all posts
Showing posts with label Redesigning The 1956 Triumph. Show all posts

Thursday, May 3, 2012

Mirror Mirror..

Got these back from Joe "The Polishing King" . These belong to the '56 Triumph Project.

Check out the detailed polish job between the fins!

























Tuesday, March 27, 2012

Mock-up.. '56 Triumph Project

With 21" front 19" rear

19" front / 19"rear
19" front / 19"rear 

Wednesday, February 29, 2012

Top yoke details.. '56 Triumph Project

This is how the handlebars connect to the top yoke (mock-up phase).
Lipped bar ends complete the curve of the top yoke. 

Monday, February 6, 2012

Clutch Lever.. '56 Triumph Project

Designed and made the clutch lever assembly.


Monday, January 23, 2012

Front End Components ONE.. '56 Triumph Project

Made all to fit the Norton pre war girder..

Fabricating the stem nut


Tuesday, January 10, 2012

Making The Seat Pan.. '56 Triumph Project

Now there is a dead-line for this project. I am probably spending more than 10 hours everyday on this build since the race season ended.
11gauge cr steel





Sunday, January 8, 2012

Sunday, October 9, 2011

Norton 16H Front End

This one belongs to the "Redesigning The 1956 Triumph" project. It is a very nice heavy duty pre-war girder with rebound springs that i'm reconditioning. 












The threads are fixed, some rust has been taken care of and new 26 TPI nuts installed. Next i will need to make some friction plates and then it will be totally striped/cleaned and ready for paint.

Friday, April 22, 2011

Making The Oil Tank - Part Two.. '56 Triumph Project

This tank is going to have an integrated oil cooler. The triangular tube/duct that I'm making will cut through the tank from the top left front (intake) to the lower right back (outlet). 

Fins on the air duct will reduce the inside temperature, especially the oil returning from the engine will directly land on the cooling duct instead of the warm oil.  

The vertical angle/form of the duct has been designed aligning to the gas tank's bottom for efficient/continuous air flow.